Long readLong read

Vancouver council to vote on 24-block protected bike lane along Broadway

On December 2, council considers a motion to build 100 km of protected cycling routes by 2029, starting with a 24-block lane on Broadway between Kitsilano and Mount Pleasant.

Email

Long read. The subject the most local outlets covered that day, with the public record behind it. Every outlet and record is linked under the story. Read the original report on hubcycling.ca.

Vancouver City Council will consider a motion on Wednesday, December 2 that would direct staff to begin design work on a protected cycling route along 24 city blocks of Broadway, running from Yew Street in Kitsilano to Main Street in Mount Pleasant. The same motion asks council to commit to building or renewing 100 km of protected cycling infrastructure across the city by the end of 2029.

The motion, numbered Motion 6, comes before the Standing Committee on Policy and Strategic Priorities. HUB Cycling, Metro Vancouver's cycling advocacy organisation, published a call to action on November 26 urging residents to write to council before the meeting or register to speak in person or by phone.

What the motion asks

Motion 6, introduced by OneCity Councillor Lucy Maloney, has two main asks. The first is a commitment to 100 km of new and renewed active transportation infrastructure by 2029, with new construction beginning in 2027. The second is a direction to city staff to begin preliminary design work on a protected lane along Broadway between Yew and Main, the same corridor where a 5.7-kilometre underground extension of the Millennium Line is under construction and expected to open in 2027.

According to Canadian Cycling Magazine, which reported on the motion on November 26, the 24-block stretch on Broadway is currently served by a detour: cyclists heading east-west either use West 10th Avenue or the "Off-Broadway" route along West 7th Avenue. Neither connects directly to the six new SkyTrain stations being built underground on Broadway.

The motion also calls for improved cycling connections in underserved neighbourhoods, with South Vancouver and Southeast Vancouver named as priority areas. HUB Cycling says the motion asks the city to close gaps in what it calls the All Ages and Abilities network, designed so that people of any age can use it safely.

The subway and the street

The Broadway Subway project is a 5.7-kilometre extension of the Millennium Line from VCC-Clark Station west to a new station at Broadway and Arbutus. The project website says the line will travel that distance in 11 minutes and can move three times as many people as the current 99 B-Line on opening day, saving the average transit user about 30 minutes a day. A direct underground connection to the Canada Line at Cambie Street is part of the design.

The subway's 2027 opening would bring thousands more people to the Broadway corridor by transit each day. HUB Cycling's November 26 article notes that the city already has 166 active projects under its cycling plans but argues the network still has significant gaps, particularly in the east-west direction along Broadway.

The case for a bike lane on Broadway has been part of the City's planning documents for years. Canadian Cycling Magazine reports that a previous council endorsed the concept in 2022 as part of the Broadway Plan. When the blocks near the new subway stations were rebuilt, however, the council that held office before October's election chose four vehicle lanes and wider sidewalks, leaving the cycling question for a later decision. Motion 6 is that later decision.

Who made the promise

Councillor Maloney, who represents OneCity on the 11-member council, is the motion's author. Her tracker page on this site records a campaign promise to bring forward a connected, protected cycling network for all ages and abilities, with underserved neighbourhoods served first; that promise carries a status of not yet started.

Mayor Pete Fry, elected with the Green Party of Vancouver in October, carried a party platform commitment to bike lanes on Broadway and to completing the cycling network in South and East Vancouver. Both remain not yet started. Councillor Devyani Singh of COPE ran on a promise to restore and extend Broadway bike lanes and to deliver cycling infrastructure in underserved areas.

Under their platforms, all three parties that hold seats from the October election, Green, COPE and OneCity, committed to expanding protected cycling during the campaign. ABC Vancouver, which held the mayor's office and a majority on the previous council, is not represented on the current council.

What the cycling network proposal covers

The 100 km figure covers the whole city, not just Broadway. The motion prioritises routes that close gaps in the existing network, with South and Southeast Vancouver specifically named as areas that have fewer protected lanes than other parts of the city. HUB Cycling's November 26 call to action frames the motion as the first formal step toward the cycling commitments made by the current council majority during the campaign.

The timeline in the motion, 100 km by the end of 2029, sets a pace of 33 km a year, beginning in 2027. The city's last major cycling plan, adopted several years ago, identified Broadway as a future protected corridor but set no construction date.

What residents can do

The Standing Committee meets Wednesday, December 2. Residents who want council to hear from them have two options. They can write to council at any time before the meeting through vancouver.ca/contact-council. They can also register to speak in person at City Hall or by phone; the registration deadline is 5 p.m. on Tuesday, December 1, through vancouver.ca/speak-to-council.

The councillors' cycling commitments are tracked on this site. Maloney's promises, Fry's promises and Singh's promises each show the status of their campaign commitments as the new council moves through its first weeks. Motion 6 is the first item directly tied to those cycling pledges.

Questions this story answers

When does Vancouver council vote on the Broadway bike lane motion?

The vote takes place Wednesday, December 2, 2026, at the Standing Committee on Policy and Strategic Priorities. HUB Cycling published details of the meeting on November 26, 2026. Residents who want to register to speak must do so by 5 p.m. Tuesday, December 1, through vancouver.ca/speak-to-council.

What does Motion 6 ask the City to do?

According to HUB Cycling's November 26, 2026 article, Motion 6 asks Vancouver council to commit to 100 km of new and renewed active transportation infrastructure by the end of 2029, with new construction beginning in 2027. It also asks staff to begin preliminary design work for a protected cycling route along Broadway between Yew Street in Kitsilano and Main Street in Mount Pleasant.

What is the Broadway Subway and why does it matter for the bike lane?

The Broadway Subway is a 5.7-kilometre extension of the Millennium Line from VCC-Clark Station to a new station at Broadway and Arbutus, with six underground stations. The broadwaysubway.ca project website says it will open in 2027 and can move three times as many people as the current 99 B-Line on opening day. Canadian Cycling Magazine reported on November 26, 2026 that the new subway stations have no direct cycling connection: cyclists now detour to West 10th Avenue or West 7th Avenue.

Who brought this motion to council?

OneCity Councillor Lucy Maloney introduced the motion. Her tracker page on this site records a campaign promise to build a connected, protected cycling network for all ages and abilities, with underserved neighbourhoods served first; that promise carries a status of not yet started. Mayor Pete Fry of the Green Party ran on a promise of bike lanes on Broadway. COPE Councillor Devyani Singh ran on a promise to restore and extend Broadway bike lanes.

Which Vancouver councillors support the motion?

Canadian Cycling Magazine reported on November 26, 2026 that Green Party, COPE and OneCity candidates all supported expanding the protected cycling network during the October 2026 election. Those three parties now hold all eleven council seats. ABC Vancouver, whose councillors chose four vehicle lanes on rebuilt Broadway blocks during the previous term, holds no seats on the current council.

What area does the 100 km proposal cover?

HUB Cycling's November 26, 2026 article says the motion covers the whole city, closing gaps in the All Ages and Abilities network. South and Southeast Vancouver are named as areas with priority need for new cycling connections. The Broadway corridor from Yew to Main is the specific route named for preliminary design work.

How can a Vancouver resident have input before the vote?

HUB Cycling lists two options. Residents can write to council at any time before December 2 through vancouver.ca/contact-council. They can also register to speak in person at City Hall or by phone; the deadline is 5 p.m. Tuesday, December 1, through vancouver.ca/speak-to-council.

What did the previous Vancouver council do about Broadway bike lanes?

Canadian Cycling Magazine reported on November 26, 2026 that the previous council endorsed protected cycling as part of the Broadway Plan in 2022. When the blocks near the new subway stations were rebuilt, the ABC-led council chose four vehicle lanes and wider sidewalks and left the cycling question for a future decision. Motion 6 is that future decision.

Sources

The pages this story draws on. Open one to check a claim yourself.

  1. 100 km of Safer Streets. Let's Make It Happen, HUB Cycling, November 26, 2026hubcycling.ca
  2. Some (hopefully) good news for bike lanes in Vancouver, Canadian Cycling Magazine, November 26, 2026cyclingmagazine.ca
  3. Broadway Subway Project, broadwaysubway.cabroadwaysubway.ca
  4. Lucy Maloney cycling promise, voche.me trackervoche.me

Found an error? Tell the editors with the corrections form. A correction is noted on the story it changes. Read our standards.

Topics

More from voche.me

CORRECTIONS

Report a problem on this page.

Tell the editors what is wrong and where the correct information can be checked. The page you are on is attached automatically.