[{"data":1,"prerenderedAt":467},["ShallowReactive",2],{"news-list":3,"article-\u002Fnews\u002Fmassey-tunnel-review-paused-richmond-november-2026":301,"article-people-\u002Fnews\u002Fmassey-tunnel-review-paused-richmond-november-2026":466},[4,22,33,43,54,67,76,89,99,108,117,129,137,149,160,170,179,188,199,214,227,236,248,258,270,280,290],{"path":5,"title":6,"description":7,"date":8,"publishedAt":9,"author":10,"category":11,"tags":12,"image":17,"imageAlt":18,"imageCredit":19,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fmassey-tunnel-review-paused-richmond-november-2026","Review of Massey Tunnel replacement paused as new BC government weighs bridge option","The provincial environmental review of the Massey Tunnel replacement has been paused at the new government's request, putting the $8.5 billion project on hold for Richmond commuters.","2026-11-20","2026-11-20T08:44:00-07:00","voche.me editors","Long read",[13,14,15,16],"Transportation","George Massey Tunnel","Highway 99","Richmond City Council","\u002Fimages\u002Fnews\u002Fbc-richmond-2026\u002Fai\u002Fmassey-tunnel-review-paused-richmond-november-2026.webp","Illustration of a highway crossing over a river with a construction crane in the background","Illustration made with AI for voche.me",null,false,{"path":23,"title":24,"description":25,"date":26,"publishedAt":27,"author":10,"category":11,"tags":28,"image":20,"imageAlt":32,"imageCredit":20,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fsteveston-christmas-events-november-december-2026","Steveston village marks the holiday season with a craft fair, a free outdoor event and the 54th Santa Claus Parade","Three public events bring residents to Steveston between November 28 and December 12, starting with a craft fair at the community centre and ending with the annual Santa Claus parade along 4th Avenue.","2026-11-18","2026-11-18T08:52:00-07:00",[29,30,31],"Steveston","community events","Richmond","Illustration of a holiday-decorated Steveston village street with string lights and banners",{"path":34,"title":35,"description":36,"date":37,"publishedAt":38,"author":10,"category":11,"tags":39,"image":20,"imageAlt":42,"imageCredit":20,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Frichmond-council-no-consumption-site-decision-november-2026","Richmond City Council votes to end any study of a supervised consumption site","Richmond City Council voted November 9 to pass a resolution stating the city will not pursue, study, or plan for a supervised consumption site, overturning a 2024 direction, and the City issued a formal clarification on November 16.","2026-11-17","2026-11-17T09:20:00-07:00",[16,40,41,31],"Public Safety","Drug Policy","Illustration of an empty city council chamber with a curved wooden dais",{"path":44,"title":45,"description":46,"date":47,"publishedAt":48,"author":10,"category":11,"tags":49,"image":20,"imageAlt":53,"imageCredit":20,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fecowaste-blundell-public-hearing-november-2026","Public hearing tonight on proposed construction waste landfill at 15555 Blundell Road","Richmond holds a public hearing on November 16 at 5:30pm on an application to allow a construction and demolition waste landfill in the Agriculture zone at 15555 Blundell Road, up to 28 metres tall and operating until 2060.","2026-11-16","2026-11-16T08:45:00-07:00",[50,51,52,31],"City Council","Environment","Housing","Illustration of a flat agricultural field with a fence line under overcast sky",{"path":55,"title":56,"description":57,"date":58,"publishedAt":59,"author":10,"category":60,"tags":61,"image":64,"imageAlt":65,"imageCredit":66,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Framen-taka-richmond-closing-november-2026","Ramen Taka closing its Aberdeen Centre location on November 29 after 8 years","Ramen Takanotsume's Richmond restaurant, the last Metro Vancouver location for the Japan-based chain, will serve its final bowls on November 29, 2026. One location in Squamish, BC remains open.","2026-11-15","2026-11-15T09:00:00-07:00","Brief",[62,63,31],"Business","Restaurants","https:\u002F\u002Fimages-dh-production-baselayer.dailyhive.com\u002Fuploads\u002F2026\u002F11\u002F469770233_18292323643234504_8077168694676460109_n-2.jpg?format=auto&width=988","A bowl of ramen from Ramen Taka with golden broth and noodles","Daily Hive Vancouver",{"path":68,"title":69,"description":70,"date":58,"publishedAt":71,"author":10,"category":11,"tags":72,"image":20,"imageAlt":75,"imageCredit":20,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Frichmond-30kmh-speed-limit-expansion-november-2026","Richmond's 30 km\u002Fh speed limit program and what comes next for residential streets","Richmond lowered speeds on about 500 km of local roads this year. The Public Works Committee meets November 18 to consider adding more streets, using signs at neighbourhood entrances rather than on every block.","2026-11-15T08:30:00-07:00",[13,73,50,74],"Road Safety","Speed Limits","Illustration of a Richmond residential street with a 30 km\u002Fh sign at the neighbourhood entrance",{"path":77,"title":78,"description":79,"date":80,"publishedAt":81,"author":10,"category":82,"tags":83,"image":87,"imageAlt":88,"imageCredit":19,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Frichmond-rcmp-boost-bust-shoplifting-november-2026","Richmond RCMP arrest 11 in sixth Boost and Bust shoplifting operation of 2026","Officers and retail partners arrested 11 people in a single day during the sixth Boost and Bust enforcement operation in Richmond this year, recovering about $3,200 in stolen goods.","2026-11-14","2026-11-14T08:00:00-07:00","Election news",[84,85,86],"safety","Richmond RCMP","shoplifting","\u002Fimages\u002Fnews\u002Fbc-richmond-2026\u002Fai\u002Frichmond-rcmp-boost-bust-shoplifting-november-2026.webp","Illustration of retail shelves with security-tagged clothing in a store",{"path":90,"title":91,"description":92,"date":80,"publishedAt":93,"author":10,"category":11,"tags":94,"image":97,"imageAlt":98,"imageCredit":19,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Ftop-events-this-weekend-in-richmond-november-14-to-15","Top events this weekend in Richmond, November 14 to 15","From a Christmas tree lighting ceremony and a live musical at Gateway Theatre to free library programs, Richmond has events for all ages this Saturday and Sunday.","2026-11-14T07:45:00-07:00",[95,31,96],"events","community","\u002Fimages\u002Fnews\u002Fbc-richmond-2026\u002Fai\u002Ftop-events-this-weekend-in-richmond-november-14-to-15.webp","Illustration of an outdoor Christmas tree lighting ceremony at a shopping plaza at night",{"path":100,"title":101,"description":102,"date":103,"publishedAt":104,"author":10,"category":11,"tags":105,"image":20,"imageAlt":107,"imageCredit":20,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Frichmond-public-works-committee-november-18-2026","Richmond's Public Works Committee reviews speed zone expansion and three road contracts on November 18","The committee meets at City Hall on November 18 to consider expanding 30 km\u002Fh zones beyond the initial rollout, a $9.7 million EV charging contract extension, a road salt contract and a traffic signal contract.","2026-11-13","2026-11-13T09:35:00-07:00",[50,13,73,106,74],"EV Charging","Illustration of a Richmond residential street with a 30 km\u002Fh speed limit sign at an intersection",{"path":109,"title":110,"description":111,"date":112,"publishedAt":113,"author":10,"category":11,"tags":114,"image":20,"imageAlt":116,"imageCredit":20,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Frichmond-planning-committee-november-17-2026","Richmond Planning Committee considers strata conversion and gas station rules at November 17 meeting","Richmond's Planning Committee meets Tuesday to review a strata title conversion for a new infill building on Fairdell Crescent and proposed changes to service station rules in the City's zoning bylaw.","2026-11-12","2026-11-12T12:54:00-07:00",[52,50,115,31],"Zoning","Illustration of a quiet residential street with small multi-unit homes and mature trees",{"path":118,"title":119,"description":120,"date":112,"publishedAt":121,"author":10,"category":82,"tags":122,"image":126,"imageAlt":127,"imageCredit":128,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Frichmond-rcmp-toy-drive-november-2026","Richmond RCMP toy drive returns to Lansdowne Centre on November 21","Richmond RCMP's 12th annual toy drive takes place on Saturday, November 21 at Lansdowne Centre. Bring a new, unwrapped toy or donate $10 to support the Richmond Christmas Fund.","2026-11-12T12:57:00-07:00",[123,124,85,125],"Community","Events","Richmond Christmas Fund","https:\u002F\u002Fgrc.ca\u002Fsites\u002Fdefault\u002Ffiles\u002Fstyles\u002Fgallery_large_1200x1200\u002Fpublic\u002F2026-11\u002F2022-11-19-001-toy-drive-020-am_1.jpg","RCMP officers and community members at the Richmond RCMP annual toy drive at Lansdowne Centre","Richmond RCMP \u002F Royal Canadian Mounted Police",{"path":130,"title":131,"description":132,"date":133,"publishedAt":134,"author":10,"category":11,"tags":135,"image":20,"imageAlt":136,"imageCredit":20,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Frichmond-gp-committee-november-16-2026","Richmond's new council sets committee assignments and considers housing and licensing at November 16 meeting","Richmond's General Purposes Committee meets Monday, November 16 to assign council liaisons to 23 advisory bodies, consider a DCC waiver for nine low-end market rental homes, and review a new restaurant licence.","2026-11-11","2026-11-11T10:38:00-07:00",[50,52,31],"Illustration of a city council committee meeting room with chairs, name placards and water glasses set out",{"path":138,"title":139,"description":140,"date":141,"publishedAt":142,"author":10,"category":11,"tags":143,"image":20,"imageAlt":148,"imageCredit":20,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Frichmond-2027-community-events-program-approved-november-2026","Richmond City Council approves $1.115 million for eight community events in 2027","Richmond City Council approved the 2027 City Signature and Community Events Program on November 9, committing $1,115,000 to eight annual festivals and grant programs.","2026-11-10","2026-11-10T07:38:00-07:00",[50,144,30,145,146,147],"Rob Howard","festivals","Steveston Salmon Festival","Richmond Cherry Blossom Festival","Illustration of a waterfront festival grounds with colourful canopies and trees under a clear sky.",{"path":150,"title":151,"description":152,"date":153,"publishedAt":154,"author":10,"category":11,"tags":155,"image":20,"imageAlt":159,"imageCredit":20,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Frichmond-council-first-regular-meeting-november-2026","Richmond City Council holds its first regular meeting tonight, with votes on consumption sites and 2027 events","Richmond City Council meets at 7 pm on November 9 for its first regular meeting, covering a formal position on supervised consumption sites, a $1.115 million events budget for 2027, and a Shell Road rezoning application.","2026-11-09","2026-11-09T07:45:00-07:00",[50,144,156,157,30,158],"Richmond Forward","public safety","housing","Illustration of an empty city council chamber with curved desks and overhead lights.",{"path":161,"title":162,"description":163,"date":164,"publishedAt":165,"author":10,"category":11,"tags":166,"image":168,"imageAlt":169,"imageCredit":19,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fmassey-tunnel-bridge-richmond-november-2026","The Fraser River crossing question: what replacing the George Massey Tunnel means for Richmond","BC's incoming Conservative government has promised to cancel the $8.5 billion tunnel replacement and build a bridge instead. Experts say switching now would waste hundreds of millions already spent.","2026-11-08","2026-11-08T07:40:00-07:00",[13,14,15,167],"Infrastructure","\u002Fimages\u002Fnews\u002Fbc-richmond-2026\u002Fai\u002Fmassey-tunnel-bridge-richmond-november-2026.webp","Illustration of a highway crossing a wide river delta, with flat farmland and distant mountains",{"path":171,"title":172,"description":173,"date":164,"publishedAt":174,"author":10,"category":124,"tags":175,"image":20,"imageAlt":178,"imageCredit":20,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fremembrance-day-richmond-cenotaph-november-2026","Road closures around City Hall as Richmond holds its Remembrance Day ceremony on November 11","No. 3 Road and Granville Avenue close near the cenotaph from 8 am to 1:30 pm. The ceremony starts at 10:40 am and the public is welcome.","2026-11-08T08:10:00-07:00",[176,124,177],"Remembrance Day","Road Closures","Illustration of a stone cenotaph with poppy wreaths in front of a civic building on a grey morning",{"path":180,"title":181,"description":182,"date":183,"publishedAt":184,"author":10,"category":11,"tags":185,"image":20,"imageAlt":187,"imageCredit":20,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Frichmond-council-consumption-site-vote-november-2026","Richmond City Council to vote Monday on declaring no supervised consumption site","Richmond City Council will hold a final vote on November 9 on a declaration that it will not explore a supervised consumption site in the city, after an earlier committee meeting advanced the motion over one councillor's request for a delay.","2026-11-07","2026-11-07T08:40:00-07:00",[16,157,186],"supervised consumption site","Illustration of an empty city council chamber",{"path":189,"title":190,"description":191,"date":183,"publishedAt":192,"author":10,"category":82,"tags":193,"image":197,"imageAlt":198,"imageCredit":19,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Frichmond-school-district-pay-transparency-november-2026","Richmond School District report shows women earn 8 per cent less per hour than men","The Richmond School District's 2025\u002F2026 Pay Transparency Report shows women earn 8 per cent less per hour than men on average, with larger gaps in overtime pay.","2026-11-07T08:44:00-07:00",[194,195,196],"Richmond Board of Education","pay equity","Richmond School District","\u002Fimages\u002Fnews\u002Fbc-richmond-2026\u002Fai\u002Frichmond-school-district-pay-transparency-november-2026.webp","Illustration of a school building exterior",{"path":200,"title":201,"description":202,"date":203,"publishedAt":204,"author":10,"category":11,"tags":205,"image":20,"imageAlt":213,"imageCredit":20,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Frichmond-board-of-education-inaugural-meeting-november-2026","Richmond Board of Education holds inaugural meeting, elects Rod Belleza as new chair","Trustees took their oaths on November 4, elected new leadership, and face an eight per cent gender pay gap across school district staff revealed by a new provincial report.","2026-11-06","2026-11-06T07:41:00-07:00",[194,206,207,208,209,210,211,212],"School District 38","rod-belleza","dean-billings","ken-hamaguchi","heather-larson","donna-sargent","alice-wong","Illustration of an empty school board meeting room with name plaques on a long table",{"path":215,"title":216,"description":217,"date":203,"publishedAt":218,"author":10,"category":82,"tags":219,"image":225,"imageAlt":226,"imageCredit":19,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Frichmond-lulu-design-awards-november-2026","City of Richmond gives out 2026 Lulu Awards for urban design","Four projects received Lulu Awards at a City council meeting on October 26, including a trail over a historic ditch and a Brighouse riverside complex.","2026-11-06T07:44:00-07:00",[220,221,222,223,224],"City of Richmond","urban design","Richmond city council","Brighouse","Oval Precinct","\u002Fimages\u002Fnews\u002Fbc-richmond-2026\u002Fai\u002Frichmond-lulu-design-awards-november-2026.webp","Illustration of a pathway bridge over an urban ditch surrounded by trees",{"path":228,"title":229,"description":230,"date":231,"publishedAt":232,"author":10,"category":82,"tags":233,"image":20,"imageAlt":235,"imageCredit":20,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Frichmond-schools-track-field-ribbons-2026-11-05","Richmond School District restores competitive track meets with placement ribbons for spring 2027","The Richmond School District will bring back placement ribbons and separate boys' and girls' events for elementary school track meets in spring 2027, after 87 per cent of students surveyed said they wanted ribbons restored.","2026-11-05","2026-11-05T07:29:00-07:00",[194,234,123],"Schools","Illustration of colourful placement ribbons on a table in a school gym",{"path":237,"title":238,"description":239,"date":231,"publishedAt":240,"author":10,"category":11,"tags":241,"image":245,"imageAlt":246,"imageCredit":247,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Frob-howard-richmond-inauguration-priorities-november-2026","Rob Howard sworn in as Richmond's new mayor with plan for trade centre, spending review and housing","Mayor Rob Howard outlined his priorities for the 2026-2030 term at Richmond City Hall on November 2: a trade and exhibition centre, an independent spending review, housing for seniors, and a council vote on supervised injection sites.","2026-11-05T07:25:00-07:00",[242,16,52,243,244],"Mayor","Public safety","Taxes and spending","https:\u002F\u002Fimages-dh-production-baselayer.dailyhive.com\u002Fuploads\u002F2026\u002F11\u002Frichmond-mayor-rob-howard-inauguration-nov-2-2026-f.jpg?format=auto","Mayor Rob Howard speaking at his inauguration at Richmond City Hall on November 2, 2026","City of Richmond \u002F Daily Hive",{"path":249,"title":250,"description":251,"date":231,"publishedAt":252,"author":10,"category":82,"tags":253,"image":255,"imageAlt":256,"imageCredit":257,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Ftourism-richmond-launchpad-program-november-2026","Tourism Richmond opens applications for mentorship program to build new local experiences","Tourism Richmond is accepting applications for its Pacific. Authentic. Experiences Launchpad program, which will give three selected participants eight months of mentorship and $5,000 to launch tourism experiences in the city. Applications close November 27.","2026-11-05T07:33:00-07:00",[254,62,123],"Tourism","https:\u002F\u002Fwww.vmcdn.ca\u002Ff\u002Ffiles\u002Frichmondnews\u002Fimages\u002Ftourism\u002Fnancy_headshot.jpg","Tourism Richmond CEO Nancy Small","Richmond News",{"path":259,"title":260,"description":261,"date":262,"publishedAt":263,"author":10,"category":11,"tags":264,"image":268,"imageAlt":269,"imageCredit":247,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Frichmond-new-council-first-week-november-2026","Richmond's new council sets its first priorities in its opening week","Mayor Rob Howard outlined plans for a trade and exhibition centre, an arts centre and a city spending review. Councillor Laura Gillanders brought a motion saying Richmond will not pursue a supervised consumption site.","2026-11-04","2026-11-04T08:25:00-07:00",[242,50,144,265,266,243,267],"Laura Gillanders","Richmond City Hall","Arts and culture","https:\u002F\u002Fimages-dh-production-baselayer.dailyhive.com\u002Fuploads\u002F2026\u002F11\u002Frichmond-mayor-rob-howard-inauguration-nov-2-2026-f.jpg","Mayor Rob Howard speaking at his inauguration ceremony at Richmond City Hall on November 2, 2026",{"path":271,"title":272,"description":273,"date":274,"publishedAt":275,"author":10,"category":82,"tags":276,"image":278,"imageAlt":279,"imageCredit":19,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fsenior-link-society-board-richmond-november-2026","Richmond society serving isolated seniors is looking for new board members","Senior Link Society, which has served lonely Richmond seniors for 26 years, is recruiting board members after its president announced they are leaving.","2026-11-01","2026-11-01T08:22:00-07:00",[96,277,31],"seniors","\u002Fimages\u002Fnews\u002Fbc-richmond-2026\u002Fai\u002Fsenior-link-society-board-richmond-november-2026.webp","Illustration of an empty community room with chairs around a table and a coffee urn",{"path":281,"title":282,"description":283,"date":284,"publishedAt":285,"author":10,"category":82,"tags":286,"image":20,"imageAlt":289,"imageCredit":20,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Frichmond-rcmp-online-marketplace-fraud-2026-10-31","Richmond RCMP warn of online marketplace fraud after $22,000 in reported losses","Fraudsters have handed buyers envelopes of worthless paper instead of payment in multiple incidents since November 2025. RCMP advise using the Exchange Zone at the No. 5 Road detachment.","2026-10-31","2026-10-31T08:26:00-07:00",[85,287,84,288,96],"fraud","online marketplace","Illustration of a police detachment exchange zone for safe online marketplace transactions",{"path":291,"title":292,"description":293,"date":284,"publishedAt":294,"author":10,"category":82,"tags":295,"image":299,"imageAlt":300,"imageCredit":247,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fwatermania-expropriation-richmond-2026-10-31","Richmond moves to take ownership of Watermania through expropriation","The City filed an expropriation notice in July 2026 to acquire the aquatic centre at Riverport before its lease expires in March 2027.","2026-10-31T08:25:00-07:00",[220,296,297,298,96],"recreation","aquatic centre","expropriation","https:\u002F\u002Fimages-dh-production-baselayer.dailyhive.com\u002Fuploads\u002F2026\u002F10\u002Fwatermania-aquatic-centre-richmond-f-1.jpg?format=auto","Watermania aquatic centre at the Riverport Sports and Entertainment Complex in Richmond, BC",{"id":302,"title":6,"aiMetadata":303,"author":10,"body":317,"candidates":403,"category":11,"date":8,"description":7,"extension":404,"faq":405,"hideFromHome":21,"image":17,"imageAlt":18,"imageCheckedAt":20,"imageCredit":19,"imageScene":433,"linkedin":434,"linkedinPostUrl":20,"meta":442,"metaDescription":444,"navigation":445,"path":5,"pinned":21,"primarySourceUrl":446,"publishedAt":9,"seo":447,"seoTitle":20,"sourceId":448,"sourceIsPaywalled":21,"sources":449,"stem":461,"storyType":462,"tags":463,"topicKey":464,"updated":20,"__hash__":465},"news\u002Fnews\u002Fmassey-tunnel-review-paused-richmond-november-2026.md",{"summary":304,"keyTopics":305,"semanticKeywords":311},"BC's Environmental Assessment Office paused its review of the $8.5 billion George Massey Tunnel replacement project on November 17, 2026. The incoming Conservative government under Premier-designate Lorne Doerkson wants to review whether to build a 10-lane bridge instead. The pause affects Richmond residents who use Highway 99 daily and workers on the project.",[14,306,307,308,309,310],"Highway 99 Tunnel Program","Environmental Assessment Office","Richmond transportation","Lorne Doerkson","BC Conservative government",[312,313,314,315,316],"Massey Tunnel replacement pause","Richmond Highway 99 commute","BC EAO review halt","Transportation Investment Corporation","tunnel vs bridge BC",{"type":318,"value":319,"toc":393},"minimark",[320,324,329,332,335,339,342,345,349,352,355,358,362,365,368,372,375,378,386,390],[321,322,323],"p",{},"The province paused the environmental review of the George Massey Tunnel replacement on November 17, 2026, putting the $8.5 billion project on hold as the incoming BC Conservative government decides whether to build a bridge instead. For Richmond, which sits at the north end of the 65-year-old crossing, the pause means more time living with the existing tunnel before any new structure carries Highway 99 traffic under the South Arm of the Fraser River.",[325,326,328],"h2",{"id":327},"what-was-paused-and-when","What was paused and when",[321,330,331],{},"The BC Environmental Assessment Office was in the final stage of its review of the tunnel replacement when the Transportation Investment Corporation asked it to stop. Olivia Stanley, the corporation's executive director of regulatory affairs, submitted the pause request on November 16, citing a need to let the incoming government set its direction. Breanna Merrigan, the EAO's project assessment director, approved the pause the next day, November 17, and asked the corporation to stay ready to restart without delays.",[321,333,334],{},"The EAO review had reached what the agency calls the effects assessment and recommendations phase, the last step before a decision on whether to approve the project. The pause stops that work from concluding while the new government conducts its own review.",[325,336,338],{"id":337},"the-tunnel-project-and-what-it-would-do-for-richmond","The tunnel project and what it would do for Richmond",[321,340,341],{},"The Transportation Investment Corporation, which manages the project, says the new tunnel would replace the existing crossing with an eight-lane immersed tube tunnel, toll-free, with dedicated bus rapid transit lanes and paths for pedestrians and cyclists. The corridor runs between Bridgeport Road in Richmond and Ladner Trunk Road in Delta. The corporation's project page states a completion date of 2031 and a cost of $8.5 billion.",[321,343,344],{},"The existing George Massey Tunnel is 65 years old. It carries Highway 99 south from Richmond to Delta and on toward the US border. The Transportation Investment Corporation's project page says the new tunnel will add dedicated bus rapid transit lanes and paths for pedestrians and cyclists, features the current tunnel does not have.",[325,346,348],{"id":347},"what-the-new-government-wants-instead","What the new government wants instead",[321,350,351],{},"Premier-designate Lorne Doerkson takes office November 20, 2026. He stated in a November 12 press release that the province should not spend more money or make new commitments that lock British Columbians into the tunnel option before his government completes its review.",[321,353,354],{},"Doerkson has proposed a 10-lane bridge as an alternative. He says the bridge would cost $6 billion, compared with the tunnel's $8.5 billion, and would take five years to build. He says the $2.5 billion difference could go toward a women and children's hospital in Surrey.",[321,356,357],{},"The original bridge plan, proposed by the BC Liberal government in 2017, had a cost estimate of $3.5 billion, or $4.5 billion in adjusted dollars, according to Parksville Qualicum News. Doerkson's new bridge estimate of $6 billion is higher than that adjusted figure.",[325,359,361],{"id":360},"workers-affected","Workers affected",[321,363,364],{},"CTV News reported on November 20, 2026 that dozens of workers have been laid off amid the uncertainty over the project. The article did not name the contractor or the union involved. Work on the tunnel was well into the construction planning phase before the pause was called.",[321,366,367],{},"Outgoing NDP Transportation Minister Mike Farnworth said in a statement that cancelling the project would cost British Columbians hundreds of millions of dollars, lay off hundreds of workers, and leave people stuck in traffic for years longer. He said Premier-designate Doerkson already knows this. Farnworth's statement describes the full cancellation scenario; the current pause is a hold on the environmental review, not a cancellation order.",[325,369,371],{"id":370},"what-comes-next","What comes next",[321,373,374],{},"No date has been set for when the review might resume. The EAO asked the Transportation Investment Corporation to maintain readiness to restart without delays. The timeline now depends on the direction the new Conservative government gives after completing its review. Doerkson takes office November 20, the same day this article publishes, so his government's review could begin immediately.",[321,376,377],{},"A switch from tunnel to bridge would require a new environmental assessment process, since the EAO was reviewing the tunnel design and not any bridge proposal. Starting over on the assessment could add years to the timeline before any new crossing opens. The existing tunnel would continue to carry traffic in the meantime.",[321,379,380,381,385],{},"For Richmond residents, the existing 65-year-old tunnel remains the crossing while the province works through its decision. Councillor Sheldon Starrett listed transit solutions as one of his priorities when he was elected in October 2026. His commitments and those of Mayor Rob Howard and the rest of the new Richmond Council can be followed at ",[382,383,384],"a",{"href":384},"\u002Fbc\u002Frichmond-2026\u002Ftracker",".",[325,387,389],{"id":388},"what-residents-can-do","What residents can do",[321,391,392],{},"The incoming government has not opened a public comment period on the bridge-versus-tunnel decision. Residents who want to follow the review can track the Transportation Investment Corporation's announcements at ticorp.ca and the EAO's project page at eao.gov.bc.ca. If and when the province opens a process for public input on the bridge option, it would be posted on those pages.",{"title":394,"searchDepth":395,"depth":395,"links":396},"",2,[397,398,399,400,401,402],{"id":327,"depth":395,"text":328},{"id":337,"depth":395,"text":338},{"id":347,"depth":395,"text":348},{"id":360,"depth":395,"text":361},{"id":370,"depth":395,"text":371},{"id":388,"depth":395,"text":389},[],"md",[406,409,412,415,418,421,424,427,430],{"question":407,"answer":408},"What happened to the George Massey Tunnel replacement project?","On November 17, 2026, the BC Environmental Assessment Office approved a pause in its review of the tunnel replacement project. The Transportation Investment Corporation requested the pause on November 16 to allow the incoming BC Conservative government to decide whether to continue with the tunnel or build a bridge instead. The project had been in the final phase of its environmental review.",{"question":410,"answer":411},"Who requested the pause in the environmental assessment?","Olivia Stanley, the Transportation Investment Corporation's executive director of regulatory affairs, submitted the pause request on November 16, 2026. She said the purpose was to allow the incoming government to establish its priorities for the crossing. Breanna Merrigan, the EAO's project assessment director, approved the request the following day.",{"question":413,"answer":414},"What is the new BC government proposing instead of the tunnel?","Premier-designate Lorne Doerkson, who takes office November 20, 2026, has proposed building a 10-lane bridge instead of the eight-lane tunnel. He says the bridge would cost $6 billion and take five years to complete, compared with the tunnel's $8.5 billion cost and 2031 completion date. The $2.5 billion difference, he says, would go toward a Surrey women and children's hospital.",{"question":416,"answer":417},"How does the Massey Tunnel replacement affect Richmond?","The George Massey Tunnel carries Highway 99 under the South Arm of the Fraser River between Bridgeport Road in Richmond and Ladner Trunk Road in Delta. The existing tunnel is 65 years old. Whether the province builds a tunnel or a bridge, Richmond sits at the north end of the crossing and would be directly affected by construction and by the final design.",{"question":419,"answer":420},"Have workers been laid off because of the pause?","CTV News reported on November 20, 2026 that dozens of workers have been laid off amid uncertainty over the project. Outgoing NDP Transportation Minister Mike Farnworth warned that cancelling the project would lay off hundreds of workers. The article did not name the contractor or the union involved.",{"question":422,"answer":423},"What did the outgoing NDP government say about the pause?","Outgoing Transportation Minister Mike Farnworth said in a statement that cancelling the project would cost British Columbians hundreds of millions of dollars, lay off hundreds of workers, and leave people stuck in traffic for years longer. He said Premier-designate Doerkson already knows this.",{"question":425,"answer":426},"What was the original cost of the bridge proposal?","The original bridge plan, proposed by the BC Liberal government in 2017, carried a cost estimate of $3.5 billion, which Parksville Qualicum News reported would be $4.5 billion in adjusted dollars. The incoming Conservative government's bridge cost estimate is $6 billion, according to Premier-designate Doerkson's own statements.",{"question":428,"answer":429},"When will the environmental assessment resume?","No date has been set for the review to resume. EAO project assessment director Breanna Merrigan asked the Transportation Investment Corporation to stay ready to restart without delays. The assessment will resume once the incoming government completes its review and gives direction on whether to proceed with the tunnel or switch to a bridge.",{"question":431,"answer":432},"Where can Richmond residents follow the promise tracker for the people they elected?","Richmond's elected council and school board are tracked at \u002Fbc\u002Frichmond-2026\u002Ftracker, where each person's commitments and their status are recorded. Transportation promises by councillors such as Sheldon Starrett, who listed transit solutions among his priorities, can be found on their individual pages.","A wide concrete highway overpass crossing a river at dusk, with a construction crane in the background and empty lanes stretching toward the horizon, no people or signage visible.",{"short":435,"long":436,"hashtags":437},"The review of the Massey Tunnel replacement has been paused. Here is what that means for Richmond residents on Highway 99.","On November 17, 2026, BC's Environmental Assessment Office approved a pause in its review of the $8.5 billion George Massey Tunnel replacement. The incoming Conservative government wants to study a bridge option instead. The existing tunnel is 65 years old and carries Highway 99 traffic between Richmond and Delta. We cover what the pause means for Richmond commuters and when the project could move forward.",[438,439,440,441],"RichmondBC","MasseyTunnel","Highway99","BCPolitics",{"sourceName":443},"voche.me","BC paused the Massey Tunnel replacement review on Nov. 17, 2026. The new government may build a bridge instead. What it means for Richmond.",true,"https:\u002F\u002Fpqbnews.com\u002F2026\u002F11\u002F19\u002Fenvironmental-assessment-of-massey-tunnel-replacement-paused-while-incoming-b-c-gov-reviews-project",{"title":6,"description":7},"feature:2026-11-20",[450,452,455,458],{"label":451,"url":446},"Parksville Qualicum News: Environmental assessment of Massey Tunnel replacement paused (November 19, 2026)",{"label":453,"url":454},"CTV News Vancouver: B.C. Environmental Assessment Office pauses review of Massey Tunnel project (November 19, 2026)","https:\u002F\u002Fctvnews.ca\u002Fvancouver\u002Farticle\u002Fbc-environmental-assessment-office-pauses-review-of-massey-tunnel-project",{"label":456,"url":457},"CTV News Vancouver: Dozens laid off amid uncertainty over Massey Tunnel replacement (November 20, 2026)","https:\u002F\u002Fctvnews.ca\u002Fvancouver\u002Fvideo\u002F2026\u002F11\u002F20\u002Fdozens-laid-off-amid-uncertainty-over-massey-tunnel-replacement",{"label":459,"url":460},"Transportation Investment Corporation: Highway 99 Tunnel Program","https:\u002F\u002Fwww.ticorp.ca\u002Fhighway-99-tunnel-program\u002F","news\u002Fmassey-tunnel-review-paused-richmond-november-2026","feature",[13,14,15,16],"massey-tunnel-review-pause-november-2026\u002Ffeature","ULXijvDofrlq-BpmgXRSOVlJy5D3gx1R1X5gN4hcJow",[],1795194057661]