[{"data":1,"prerenderedAt":531},["ShallowReactive",2],{"news-list":3,"article-\u002Fnews\u002Fcoquitlam-water-main-pipeline-road-delay-november-2026":385,"article-people-\u002Fnews\u002Fcoquitlam-water-main-pipeline-road-delay-november-2026":519},[4,22,33,46,59,71,84,94,105,116,128,137,146,156,168,179,189,201,209,217,227,235,246,259,273,284,297,307,318,327,336,346,355,364,374],{"path":5,"title":6,"description":7,"date":8,"publishedAt":9,"author":10,"category":11,"tags":12,"image":17,"imageAlt":18,"imageCredit":19,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fcoquitlam-arena-ice-shortage-november-2026","Coquitlam indoor sports group says new Planet Ice deal falls short of long-term need","A group representing 16 indoor sports organizations says the City's 15-year agreement with Planet Ice adds 135 hours of annual ice time but does not address the shortage that will grow through the 2030s.","2026-11-26","2026-11-26T08:42:00-07:00","voche.me editors","Election news",[13,14,15,16],"community","arena","ice","City of Coquitlam","\u002Fimages\u002Fnews\u002Fbc-coquitlam-2026\u002Fai\u002Fcoquitlam-arena-ice-shortage-november-2026.webp","Illustration of an empty indoor ice rink with overhead lights and a Zamboni near the boards.","Illustration made with AI for voche.me",null,false,{"path":23,"title":24,"description":25,"date":8,"publishedAt":26,"author":10,"category":11,"tags":27,"image":20,"imageAlt":32,"imageCredit":20,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fcoquitlam-water-main-pipeline-road-delay-november-2026","Pipeline Road water main work delayed by one year, now expected to finish in early 2028","Metro Vancouver announced November 24 that Phase 1 of the Coquitlam Water Main project, running along Pipeline Road from Robson Drive to Guildford Way, will finish about a year later than planned after Telus cable conflicts halted work for ten months.","2026-11-26T08:48:00-07:00",[28,29,30,31],"transport","infrastructure","Metro Vancouver","Pipeline Road","Illustration of a large pipe being installed in an open trench along a city road.",{"path":34,"title":35,"description":36,"date":8,"publishedAt":37,"author":10,"category":38,"tags":39,"image":44,"imageAlt":45,"imageCredit":19,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fcoquitlam-weekend-events-november-27-29-2026","Top events this weekend in Coquitlam, November 27 to 29","The Lights at Lafarge opens Friday evening at Town Centre Park, with two more shows and a Sunday afternoon drama performance filling out the weekend.","2026-11-26T08:30:46-07:00","Long read",[40,41,42,43],"events","Lights at Lafarge","Evergreen Arts","Dogwood Pavilion","\u002Fimages\u002Fnews\u002Fbc-coquitlam-2026\u002Fai\u002Fcoquitlam-weekend-events-november-27-29-2026.webp","Illustration of a lakeside park lit up with colorful holiday lights at night.",{"path":47,"title":48,"description":49,"date":50,"publishedAt":51,"author":10,"category":38,"tags":52,"image":20,"imageAlt":58,"imageCredit":20,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fcoquitlam-river-flood-forecasting-grant-november-2026","Coquitlam applies for grant to build a better flood model for the Coquitlam River","Coquitlam City Council voted unanimously to seek $150,000 from the Union of B.C. Municipalities to build a hydrological model that accounts for the Coquitlam Dam and BC Hydro's water management during storms.","2026-11-25","2026-11-25T08:29:00-07:00",[53,54,55,56,57],"flood forecasting","Coquitlam River","City Council","safety","environment","Illustration of a river flowing past a dam with forested banks under cloudy skies",{"path":60,"title":61,"description":62,"date":63,"publishedAt":64,"author":10,"category":38,"tags":65,"image":20,"imageAlt":70,"imageCredit":20,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fcoquitlam-election-results-report-november-2026","Coquitlam's October 2026 election drew 24 percent turnout and a record advance vote","The City of Coquitlam's chief election officer filed the statutory results report on November 23, 2026, showing 24 percent turnout, 8,409 advance voters and six mail ballots lost to Canada Post delays.","2026-11-24","2026-11-24T08:33:00-07:00",[66,67,68,69,16],"Coquitlam election 2026","election results","voter turnout","Craig Hodge","Illustration of ballot boxes on a table in an empty polling station",{"path":72,"title":73,"description":74,"date":63,"publishedAt":75,"author":10,"category":11,"tags":76,"image":82,"imageAlt":83,"imageCredit":19,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fcoquitlam-rcmp-iio-cleared-coquitlam-centre-november-2026","Officers cleared after arrest at Coquitlam Centre Mall parking lot in October 2025","BC's police oversight office found no grounds to believe officers committed an offence during an arrest at Coquitlam Centre Mall in October 2025 that left a suspect injured.","2026-11-24T08:36:00-07:00",[77,78,79,80,81],"RCMP","Coquitlam RCMP","IIO BC","public safety","Coquitlam Centre","\u002Fimages\u002Fnews\u002Fbc-coquitlam-2026\u002Fai\u002Fcoquitlam-rcmp-iio-cleared-coquitlam-centre-november-2026.webp","Illustration of an empty mall parking lot at night with overhead lights",{"path":85,"title":86,"description":87,"date":63,"publishedAt":88,"author":10,"category":11,"tags":89,"image":20,"imageAlt":93,"imageCredit":20,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fplanet-ice-coquitlam-agreement-november-2026","Coquitlam signs 15-year deal to keep Planet Ice open and add community ice time","The City of Coquitlam and GSL Group signed a 15-year agreement for Planet Ice at 2300 Rocket Way, with $8 million in combined investment and 135 more prime-time hours for community groups each year.","2026-11-24T08:37:00-07:00",[16,90,91,92,69],"Planet Ice","recreation","community facilities","Illustration of an empty indoor ice rink with overhead lights and a Zamboni near the boards",{"path":95,"title":96,"description":97,"date":98,"publishedAt":99,"author":10,"category":38,"tags":100,"image":20,"imageAlt":104,"imageCredit":20,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fsd43-board-first-regular-meeting-november-24-2026","School District 43 Board holds its first regular meeting of the new term on November 24","The nine-member Board of Education of School District 43 (Coquitlam) meets at 1080 Winslow Avenue on November 24 at 7 pm. Residents can attend in person or watch by MS Teams livestream.","2026-11-22","2026-11-22T08:36:00-07:00",[101,102,103],"school-trustee","school-district-43","coquitlam-board-of-education","Illustration of a school board meeting room with an empty table and chairs",{"path":106,"title":107,"description":108,"date":109,"publishedAt":110,"author":10,"category":38,"tags":111,"image":114,"imageAlt":115,"imageCredit":19,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fcoquitlam-weekend-events-november-20-22-2026","Top events this weekend in Coquitlam, November 20 to 22","Three public events in Coquitlam this weekend: a theatre run at Evergreen, a local arts sale at Dogwood Pavilion, and a family percussion show Sunday afternoon.","2026-11-20","2026-11-20T08:34:37-07:00",[40,112,13,113],"arts","Coquitlam","\u002Fimages\u002Fnews\u002Fbc-coquitlam-2026\u002Fai\u002Fcoquitlam-weekend-events-november-20-22-2026.webp","Illustration of a performing arts centre plaza on an autumn weekend",{"path":117,"title":118,"description":119,"date":120,"publishedAt":121,"author":10,"category":38,"tags":122,"image":20,"imageAlt":127,"imageCredit":20,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fcoquitlam-2027-budget-survey-deadline-november-2026","Coquitlam's 2027 budget survey closes November 22","Residents have three days to tell the new council what to spend money on before staff begin building next year's budget.","2026-11-19","2026-11-19T08:45:00-07:00",[123,124,125,126],"Coquitlam City Council","budget","taxes","public engagement","Illustration of a city hall with a glass-and-concrete facade and an empty plaza in front",{"path":129,"title":130,"description":131,"date":132,"publishedAt":133,"author":10,"category":11,"tags":134,"image":20,"imageAlt":136,"imageCredit":20,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fcoquitlam-council-personal-leave-policy-november-2026","Coquitlam council reaffirms 16-week paid leave policy for elected officials","Coquitlam city council voted on November 16 to keep a 2022 policy giving elected officials up to 16 weeks of paid personal leave, saying BC's Community Charter does not reflect the realities of modern elected office.","2026-11-18","2026-11-18T09:05:00-07:00",[55,135],"Policy","Illustration of an empty municipal council chamber with chairs around a curved table",{"path":138,"title":139,"description":140,"date":132,"publishedAt":141,"author":10,"category":38,"tags":142,"image":20,"imageAlt":145,"imageCredit":20,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fnorth-road-coquitlam-housing-agreement-november-2026","Coquitlam council approves housing agreement for 27-storey tower at 727 North Rd.","City council unanimously passed a housing agreement bylaw on November 17 for a strata tower and rental building on the Burnaby border, with one more vote needed before construction begins.","2026-11-18T08:50:00-07:00",[143,55,144],"Housing","Development","Illustration of a vacant development site on a city street, bordered by a sidewalk and trees",{"path":147,"title":148,"description":149,"date":150,"publishedAt":151,"author":10,"category":38,"tags":152,"image":154,"imageAlt":155,"imageCredit":19,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fcoquitlam-watershed-society-funding-request-2027-november-2026","Coquitlam River Watershed Society asks council for $36,120 a year through 2031","The organization that monitors salmon habitat, water quality and flood infrastructure on the Coquitlam River presented its 2027 funding request to Coquitlam City Council on November 16.","2026-11-17","2026-11-17T09:02:56-07:00",[57,124,54,153,55],"watershed","\u002Fimages\u002Fnews\u002Fbc-coquitlam-2026\u002Fai\u002Fcoquitlam-watershed-society-funding-request-2027-november-2026.webp","Illustration of a river flowing through a forest with a water monitoring station on the bank.",{"path":157,"title":158,"description":159,"date":150,"publishedAt":160,"author":10,"category":11,"tags":161,"image":166,"imageAlt":167,"imageCredit":19,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fradio-canada-poirier-library-residency-coquitlam-november-2026","Radio-Canada reporter at Poirier library until November 20 to gather Coquitlam stories","Dominique Lévesque of Radio-Canada is based at the Poirier branch of the Coquitlam Public Library until November 20 as part of the Écho local project, collecting stories from francophone residents.","2026-11-17T09:14:00-07:00",[13,162,163,164,165],"Coquitlam Public Library","Radio-Canada","francophone","Maillardville","\u002Fimages\u002Fnews\u002Fbc-coquitlam-2026\u002Fai\u002Fradio-canada-poirier-library-residency-coquitlam-november-2026.webp","Illustration of the inside of a public library with tables and bookshelves.",{"path":169,"title":170,"description":171,"date":172,"publishedAt":173,"author":10,"category":38,"tags":174,"image":20,"imageAlt":178,"imageCredit":20,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fburke-mountain-community-centre-coquitlam-construction-november-2026","Burke Mountain Community Centre: what Coquitlam is building, and when it opens","Construction is underway on Coquitlam's first new recreation centre in decades. The 80,000-square-foot building opens in 2029 and is backed by $67.4 million in federal funding.","2026-11-15","2026-11-15T09:01:00-07:00",[91,29,175,176,177],"community centre","Burke Mountain","construction","Illustration of a recreation centre building under construction on a hillside",{"path":180,"title":181,"description":182,"date":172,"publishedAt":183,"author":10,"category":11,"tags":184,"image":187,"imageAlt":188,"imageCredit":19,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fspuraway-avenue-closure-coquitlam-november-2026","Spuraway Avenue closes for utility work November 16 to 20 in Coquitlam","City crews will close Spuraway Avenue between Starlight Way and Wagon Wheel Circle from 8 a.m. to 5 p.m. each day for one week of utility maintenance.","2026-11-15T09:02:00-07:00",[185,186,28,113],"road closure","utility work","\u002Fimages\u002Fnews\u002Fbc-coquitlam-2026\u002Fai\u002Fspuraway-avenue-closure-coquitlam-november-2026.webp","Illustration of a street closed with orange traffic cones and a detour sign",{"path":190,"title":191,"description":192,"date":193,"publishedAt":194,"author":10,"category":11,"tags":195,"image":198,"imageAlt":199,"imageCredit":200,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fcoquitlam-rcmp-school-threats-youth-charged-november-2026","Youth charged over school threats that shut down Coquitlam classrooms in February","Coquitlam RCMP say the B.C. Prosecution Service approved a charge of uttering threats against a minor on October 8, more than a month before the announcement.","2026-11-14","2026-11-14T08:41:00-07:00",[56,78,196,197],"schools","School District 43","https:\u002F\u002Fbellmediainc-bnn-bloomberg-prod.web.arc-cdn.net\u002Fresizer\u002Fv2\u002Fhttps%3A%2F%2Farc-goldfish-bellmediainc-thumbnails.s3.amazonaws.com%2F02-07-2026%2Ft_eb4841e1857d4cef9223e33643eee649_name_BC020626_CENTENNIAL_frame_351.jpg?auth=fdeb609ebdaca85dfc58254f74a660e7ee1649b7ab5c5c79fd4c493a1ab25ad9&width=576&height=324&smart=true&quality=80","Centennial Secondary School in Coquitlam","CTV News",{"path":202,"title":203,"description":204,"date":205,"publishedAt":206,"author":10,"category":38,"tags":207,"image":20,"imageAlt":208,"imageCredit":20,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fcoquitlam-weekend-events-november-14-15-2026","Top events this weekend in Coquitlam, November 13 to 15","Five public events in Coquitlam this weekend: a winter market, two art openings, a blues concert, a family gallery day, and a South Asian classical music performance.","2026-11-13","2026-11-13T09:57:00-07:00",[40,112,13,113],"Illustration of an outdoor winter market pavilion with vendor tables, string lights, and handmade goods on display.",{"path":210,"title":211,"description":212,"date":205,"publishedAt":213,"author":10,"category":11,"tags":214,"image":215,"imageAlt":216,"imageCredit":19,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fcoquitlam-winter-program-registration-november-2026","Coquitlam winter program registration opens November 17","The City of Coquitlam opens registration for winter recreation programs starting November 17, with general registration beginning November 24 for residents.","2026-11-13T18:48:00-07:00",[13,91,16],"\u002Fimages\u002Fnews\u002Fbc-coquitlam-2026\u002Fai\u002Fcoquitlam-winter-program-registration-november-2026.webp","Illustration of an indoor public swimming pool with lane dividers and kickboards stacked beside the deck",{"path":218,"title":219,"description":220,"date":221,"publishedAt":222,"author":10,"category":11,"tags":223,"image":225,"imageAlt":226,"imageCredit":19,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fcoquitlam-landlord-tenancy-court-ruling-november-2026","BC Supreme Court upholds $40,431 award to Coquitlam tenant after landlord's appeal fails","Justice David Layton dismissed a Coquitlam landlord's petition in BC Supreme Court on November 11, upholding an arbitrator's decision that awarded a former tenant $40,431.","2026-11-12","2026-11-12T13:35:00-07:00",[143,224,113],"Tenancy","\u002Fimages\u002Fnews\u002Fbc-coquitlam-2026\u002Fai\u002Fcoquitlam-landlord-tenancy-court-ruling-november-2026.webp","Illustration of legal documents stacked on a desk beside a small house keychain",{"path":228,"title":229,"description":230,"date":221,"publishedAt":231,"author":10,"category":38,"tags":232,"image":20,"imageAlt":234,"imageCredit":20,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fcraig-hodge-coquitlam-mayor-first-address-november-2026","Craig Hodge sets affordability and safety as his first priorities as Coquitlam mayor","In his first address as mayor, Craig Hodge named housing choices, safer streets and infrastructure as the work his new council will take on over the next four years.","2026-11-12T13:05:00-07:00",[233,55,69],"Mayor","Illustration of an empty municipal council chamber with a curved table and civic seal on the wall",{"path":236,"title":237,"description":238,"date":221,"publishedAt":239,"author":10,"category":11,"tags":240,"image":244,"imageAlt":245,"imageCredit":19,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Foregon-forestsnail-coquitlam-colony-farm-november-2026","Kwikwetlem First Nation study tracks endangered snails at Colony Farm in Coquitlam","Researchers have tagged 832 Oregon forestsnails across four plots at Colony Farm Regional Park to find out how many survive and what their habitat needs.","2026-11-12T13:20:00-07:00",[241,242,243],"Environment","Colony Farm","Kwikwetlem First Nation","\u002Fimages\u002Fnews\u002Fbc-coquitlam-2026\u002Fai\u002Foregon-forestsnail-coquitlam-colony-farm-november-2026.webp","Illustration of a small brown spiral shell resting on a green leaf surrounded by forest plants",{"path":247,"title":248,"description":249,"date":250,"publishedAt":251,"author":10,"category":11,"tags":252,"image":257,"imageAlt":258,"imageCredit":16,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fcoquitlam-junior-firefighter-program-2027-registration-november-2026","Coquitlam Fire Rescue opens registration for 2027 Junior Firefighter Program","Grade 11 and 12 students in School District 43 can apply for a week of hands-on fire training in March 2027. The deadline to apply is December 4, 2026.","2026-11-11","2026-11-11T09:58:53-07:00",[13,253,254,255,256],"youth","fire rescue","school district 43","coquitlam","https:\u002F\u002Fcoquitlam.ca\u002FImageRepository\u002FDocument?documentID=20827","Students in firefighter gear during training at Coquitlam Fire Rescue's Junior Firefighter Program",{"path":260,"title":261,"description":262,"date":263,"publishedAt":264,"author":10,"category":38,"tags":265,"image":271,"imageAlt":272,"imageCredit":19,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fcoquitlam-snow-angel-winter-volunteer-program-november-2026","Coquitlam Snow Angel program pairs volunteers with seniors who need help clearing sidewalks this winter","The City of Coquitlam is recruiting volunteers to shovel sidewalks for seniors and people with disabilities under its Snow Angel program, which runs from October through March.","2026-11-10","2026-11-10T09:01:00-07:00",[113,266,267,268,13,269,270],"snow removal","seniors","volunteer","winter","Winter Wise","\u002Fimages\u002Fnews\u002Fbc-coquitlam-2026\u002Fai\u002Fcoquitlam-snow-angel-winter-volunteer-program-november-2026.webp","Illustration of a snow-covered sidewalk next to a cleared residential path with a shovel resting against a fence",{"path":274,"title":275,"description":276,"date":277,"publishedAt":278,"author":10,"category":38,"tags":279,"image":282,"imageAlt":283,"imageCredit":19,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Flights-at-lafarge-coquitlam-november-2026","Lights at Lafarge opens November 27 at Town Centre Park in Coquitlam","The City of Coquitlam's free outdoor winter light display opens November 27 with live performances, a fire show and food vendors. The display runs nightly through February 2027.","2026-11-09","2026-11-09T08:51:00-07:00",[41,280,281,269,13],"Town Centre Park","Coquitlam events","\u002Fimages\u002Fnews\u002Fbc-coquitlam-2026\u002Fai\u002Flights-at-lafarge-coquitlam-november-2026.webp","Illustration of colourful light displays reflected in a lake at night along a paved walking path",{"path":285,"title":286,"description":287,"date":288,"publishedAt":289,"author":10,"category":11,"tags":290,"image":295,"imageAlt":296,"imageCredit":19,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fcoquitlam-intersection-safety-work-november-9-2026","Two Coquitlam intersections get safety work starting Monday, November 9","The City of Coquitlam is doing safety improvements at Clarke Road and Glenayre Drive and at Guildford Way and Lansdowne Drive on November 9. Drivers should plan alternate routes or extra time.","2026-11-08","2026-11-08T08:46:00-07:00",[28,291,292,293,294],"road work","safety improvements","Clarke Road","Guildford Way","\u002Fimages\u002Fnews\u002Fbc-coquitlam-2026\u002Fai\u002Fcoquitlam-intersection-safety-work-november-9-2026.webp","Illustration of a suburban intersection with orange construction signs and pylons for road work.",{"path":298,"title":299,"description":300,"date":301,"publishedAt":302,"author":10,"category":38,"tags":303,"image":20,"imageAlt":306,"imageCredit":20,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fsd43-new-board-coquitlam-trustees-november-2026","School District 43's new board takes office, with the four Coquitlam trustees' first regular meeting on November 24","Nine trustees took the oath of office on November 3 at the SD43 inaugural board meeting. The four elected by Coquitlam voters made specific commitments on school buildings, inclusion and mental health.","2026-11-07","2026-11-07T07:30:00-07:00",[197,304,113,305],"school trustees","Board of Education","Illustration of an empty school board meeting room with chairs around a table",{"path":308,"title":309,"description":310,"date":311,"publishedAt":312,"author":10,"category":38,"tags":313,"image":315,"imageAlt":316,"imageCredit":317,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fcoquitlam-budget-tax-forecast-2027-2030-november-2026","Coquitlam's 2027 budget heads into new council's first term with a 7% annual tax rise in the plan","City staff are forecasting a 7% increase in property taxes and utility fees each year from 2027 to 2030, as Coquitlam's new mayor and council prepare to set their first budget.","2026-11-06","2026-11-06T07:55:00-07:00",[124,314,16,123],"property taxes","https:\u002F\u002Fwww.freshetnews.ca\u002Fwp-content\u002Fuploads\u002F2026\u002F11\u002F5amcgcr8n1y.jpg","City hall building exterior","Sasun Bughdaryan \u002F Unsplash via Freshet News",{"path":319,"title":320,"description":321,"date":322,"publishedAt":323,"author":10,"category":38,"tags":324,"image":325,"imageAlt":326,"imageCredit":16,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fcoquitlam-new-mayor-council-inauguration-november-2026","Coquitlam swears in its first new mayor in 18 years on November 9","Craig Hodge and eight councillors take office Monday at the 2026 Inaugural Council Meeting, starting the 2026-2030 term.","2026-11-05","2026-11-05T07:26:33-07:00",[233,55,69],"https:\u002F\u002Fcoquitlam.ca\u002FImageRepository\u002FDocument?documentID=20813","Coquitlam City Hall at Lafarge Lake",{"path":328,"title":329,"description":330,"date":331,"publishedAt":332,"author":10,"category":38,"tags":333,"image":334,"imageAlt":335,"imageCredit":16,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fcoquitlam-2027-budget-survey-november-2026","Coquitlam asks residents how to balance its 2027 budget","The City of Coquitlam has opened an online survey until November 22 asking residents to weigh in on how to balance rising costs against service levels in the 2027 budget.","2026-11-04","2026-11-04T07:28:00-07:00",[124,16,123],"https:\u002F\u002Fcoquitlam.ca\u002FImageRepository\u002FDocument?documentID=20812","Coquitlam City Hall",{"path":337,"title":338,"description":339,"date":331,"publishedAt":340,"author":10,"category":341,"tags":342,"image":344,"imageAlt":345,"imageCredit":19,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fcoquitlam-remembers-november-2026","Coquitlam Remembers: ceremonies and poppy painting events run through November 11","The City of Coquitlam has opened a series of Remembrance Day events including poppy painting at Blue Mountain Park, a community cenotaph ceremony on November 11, and a new public art installation along Ridgeway Avenue.","2026-11-04T07:42:00-07:00","Community",[13,16,343],"Remembrance Day","\u002Fimages\u002Fnews\u002Fbc-coquitlam-2026\u002Fai\u002Fcoquitlam-remembers-november-2026.webp","Illustration of painted poppies along a park path in autumn",{"path":347,"title":348,"description":349,"date":331,"publishedAt":350,"author":10,"category":341,"tags":351,"image":353,"imageAlt":354,"imageCredit":19,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Ffraser-river-literary-festival-coquitlam-november-2026","Fraser River Literary Festival brings 32 authors to Coquitlam and New Westminster through November 8","Coquitlam Public Library and New Westminster Public Library have launched the first Fraser River Literary Festival, running November 1 to 8 with 24 events, 32 local authors, and two gala evenings. Most events are free.","2026-11-04T07:56:00-07:00",[13,16,352],"library","\u002Fimages\u002Fnews\u002Fbc-coquitlam-2026\u002Fai\u002Ffraser-river-literary-festival-coquitlam-november-2026.webp","Illustration of a book display table in a sunny public library",{"path":356,"title":357,"description":358,"date":331,"publishedAt":359,"author":10,"category":360,"tags":361,"image":362,"imageAlt":363,"imageCredit":19,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Fpipeline-road-water-main-coquitlam-november-2026","Water main work starts this month on Pipeline Road in Coquitlam, running 16 months","Metro Vancouver is starting site preparation and excavation this month on two underground valve chambers and 200 metres of water main along Pipeline Road north of David Avenue, with loud construction noise expected. Work runs through early 2028.","2026-11-04T07:49:00-07:00","Getting around",[29,16,30],"\u002Fimages\u002Fnews\u002Fbc-coquitlam-2026\u002Fai\u002Fpipeline-road-water-main-coquitlam-november-2026.webp","Illustration of an open trench on a city street with construction equipment and workers",{"path":365,"title":366,"description":367,"date":331,"publishedAt":368,"author":10,"category":341,"tags":369,"image":372,"imageAlt":373,"imageCredit":19,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Ftri-cities-overnight-shelter-coquitlam-november-2026","Overnight shelter opens in Coquitlam with 20 beds and a hot meal","An overnight shelter with 20 beds has opened at the former Riverview Hospital site in Coquitlam, operated by Progressive Housing Society and running nightly from 8 pm to 7 am through March 31.","2026-11-04T07:35:00-07:00",[370,16,371],"housing","homelessness","\u002Fimages\u002Fnews\u002Fbc-coquitlam-2026\u002Fai\u002Ftri-cities-overnight-shelter-coquitlam-november-2026.webp","Illustration of an overnight shelter with cots and a serving table",{"path":375,"title":376,"description":377,"date":378,"publishedAt":379,"author":10,"category":11,"tags":380,"image":382,"imageAlt":383,"imageCredit":384,"updated":20,"linkedinPostUrl":20,"pinned":21,"hideFromHome":21},"\u002Fnews\u002Frichard-stewart-farewell-coquitlam-council-2026-10-29","Outgoing Mayor Richard Stewart hands the gavel to Craig Hodge at Coquitlam's final council meeting","Stewart wrapped up 18 years in office at the last meeting of the term, warning his successors against zero-percent tax freezes and calling mental health a priority for the new council.","2026-10-29","2026-10-31T09:29:00-07:00",[233,123,381],"transition","https:\u002F\u002Fd30791g68t1h2.cloudfront.net\u002Fwp-content\u002Fuploads\u002F2026\u002F10\u002F29195514\u002F0utgoing.jpg","Outgoing Coquitlam Mayor Richard Stewart at his final council meeting","Tri-Cities Dispatch",{"id":386,"title":24,"aiMetadata":387,"author":10,"body":397,"candidates":467,"category":11,"date":8,"description":25,"extension":469,"faq":470,"hideFromHome":21,"image":20,"imageAlt":32,"imageCheckedAt":20,"imageCredit":20,"imageScene":495,"linkedin":496,"linkedinPostUrl":20,"meta":502,"metaDescription":20,"navigation":504,"path":23,"pinned":21,"primarySourceUrl":505,"publishedAt":26,"seo":506,"seoTitle":20,"sourceId":507,"sourceIsPaywalled":21,"sources":508,"stem":514,"storyType":515,"tags":516,"topicKey":517,"updated":20,"__hash__":518},"news\u002Fnews\u002Fcoquitlam-water-main-pipeline-road-delay-november-2026.md",{"summary":388,"keyTopics":389,"semanticKeywords":392},"Metro Vancouver's Phase 1 water main on Pipeline Road in Coquitlam is delayed by about a year, now due in early 2028, after Telus cable conflicts halted work for ten months. Mayor Craig Hodge and council were briefed at the November 23 committee meeting.",[390,31,30,391],"Coquitlam Water Main","infrastructure delay",[393,394,395,396],"Coquitlam Pipeline Road construction","Metro Vancouver water main Coquitlam","Pipeline Road delay 2028","Coquitlam infrastructure project",{"type":398,"value":399,"toc":460},"minimark",[400,404,413,418,421,424,427,431,434,437,441,444,447,450],[401,402,403],"p",{},"Drivers who use Pipeline Road in Coquitlam should plan for continued construction through early 2028, about a year later than originally scheduled, after underground utility conflicts delayed Metro Vancouver's water main project by ten months.",[401,405,406,407,412],{},"Metro Vancouver announced the revised timeline on November 24, Freshet News reported. ",[408,409,411],"a",{"href":410},"\u002Fbc\u002Fcoquitlam-2026\u002Fcandidates\u002Fcraig-hodge","Mayor Craig Hodge"," and council were briefed at the November 23 committee meeting, where the city received a second trimester progress report on the project.",[414,415,417],"h2",{"id":416},"what-caused-the-delay","What caused the delay",[401,419,420],{},"When the contractor opened Pipeline Road for the new water main, Telus cables were found in a different location than what Metro Vancouver's records showed. The regional agency had to request a redesign from Telus and relocate the cables before work could continue. BC Hydro's underground work in the area was then halted while the cable conflict was being resolved.",[401,422,423],{},"Metro Vancouver senior engineer Arezoo Heidarian told Freshet News: \"There was a cascading of delays. It took 10 months to resolve the conflict, but it was out of our control.\"",[401,425,426],{},"Telus and BC Hydro have since completed their work along Pipeline Road. As of the announcement, 1,200 of the 1,400 metres of Phase 1 have been installed, Heidarian said.",[414,428,430],{"id":429},"the-project","The project",[401,432,433],{},"The Coquitlam Water Main is a 12-kilometre line running from the northern end of Pipeline Road to Mariner Way at Riverview Crescent. Metro Vancouver has divided the work into four sections: Robson to Guildford, Cape Horn, Pipeline Road North, and a City Centre tunnel. Phase 1, the Robson to Guildford section, spans 1.4 kilometres and the pipe measures 3.2 metres in diameter. Construction on that section started in fall 2023.",[401,435,436],{},"The full project runs from 2023 to 2034, according to Metro Vancouver's project page.",[414,438,440],{"id":439},"what-the-city-is-doing","What the city is doing",[401,442,443],{},"Jaime Boan, Coquitlam's general manager of engineering and public works, told the committee that city staff maintain weekly contact with Metro Vancouver and are working to keep traffic disruptions and noise as low as possible, Freshet News reported.",[401,445,446],{},"Hodge suggested adding more road signage along Pipeline Road to inform commuters about the extended timeline. \"The city and Metro Vancouver are taking the heat for third-party issues,\" Hodge said.",[401,448,449],{},"Heidarian declined to disclose the financial impact of the delay. Metro Vancouver said it will update nearby residents through newsletters and meetings, with a community liaison officer collecting feedback. Residents can contact Metro Vancouver by phone at 604-432-6200.",[401,451,452,453,459],{},"Drivers can check the City of Coquitlam's website at ",[408,454,458],{"href":455,"rel":456},"https:\u002F\u002Fcoquitlam.ca",[457],"nofollow","coquitlam.ca"," or follow the city on social media for traffic updates on Pipeline Road.",{"title":461,"searchDepth":462,"depth":462,"links":463},"",2,[464,465,466],{"id":416,"depth":462,"text":417},{"id":429,"depth":462,"text":430},{"id":439,"depth":462,"text":440},[468],"craig-hodge","md",[471,474,477,480,483,486,489,492],{"question":472,"answer":473},"How long is Phase 1 of the Coquitlam Water Main project delayed?","Phase 1, which runs along Pipeline Road from Robson Drive to Guildford Way, is now expected to finish in early 2028. Metro Vancouver announced the delay on November 24, 2026. The original schedule was not given in the announcement, but the new completion date is about one year later than previously planned, Freshet News reported.",{"question":475,"answer":476},"What caused the delay on Pipeline Road?","When the contractor opened Pipeline Road for the new water main, Telus cables were found in a different location than the documented records showed. Metro Vancouver had to request a redesign from Telus and move the cables. BC Hydro's underground work in the area was then halted while the conflict was resolved. Metro Vancouver senior engineer Arezoo Heidarian said: 'There was a cascading of delays. It took 10 months to resolve the conflict, but it was out of our control.'",{"question":478,"answer":479},"How much of Phase 1 has been installed as of November 2026?","Metro Vancouver senior engineer Arezoo Heidarian told Freshet News that 1,200 of the 1,400 metres of Phase 1 have now been installed. Telus and BC Hydro have both completed their work along Pipeline Road, Freshet News reported on November 25.",{"question":481,"answer":482},"What is the full scope of the Coquitlam Water Main project?","The project is a 12-kilometre water main running from the northern end of Pipeline Road to Mariner Way at Riverview Crescent. It is divided into four sections: Robson to Guildford, Cape Horn, Pipeline Road North, and a City Centre tunnel. Metro Vancouver says the full project runs from 2023 to 2034. Phase 1, the Robson to Guildford section, spans 1.4 kilometres and the pipe measures 3.2 metres in diameter. Construction on that section started in fall 2023.",{"question":484,"answer":485},"What is Coquitlam doing about traffic during the delay?","Mayor Craig Hodge suggested adding more road signage to alert commuters and residents about the extended timeline at the November 23 Coquitlam council committee meeting. Hodge said: 'The city and Metro Vancouver are taking the heat for third-party issues.' The City's general manager of engineering and public works, Jaime Boan, said city staff maintain weekly contact with Metro Vancouver and are working to keep traffic impacts as small as possible, Freshet News reported.",{"question":487,"answer":488},"What financial impact has the delay had?","Metro Vancouver senior engineer Arezoo Heidarian declined to disclose the financial impact of the delays, telling Freshet News: 'For now, our focus is to finish the work.' No cost figure for the delay was published.",{"question":490,"answer":491},"How will Metro Vancouver keep residents informed about the project?","Metro Vancouver told Freshet News it will update nearby property owners through newsletters and meetings. A dedicated community liaison officer is collecting feedback. Residents can also contact Metro Vancouver by phone at 604-432-6200 or through the contact form on metrovancouver.org.",{"question":493,"answer":494},"Where can Coquitlam residents find more information about the water main project?","Metro Vancouver's project page at metrovancouver.org describes the full 12-kilometre Coquitlam Water Main project, which runs from 2023 to 2034. For current road conditions on Pipeline Road, residents can check the City of Coquitlam's website at coquitlam.ca or follow the city on social media for traffic updates.","An open trench in a city road showing a large diameter pipe being installed, construction equipment beside it, no workers visible.",{"short":497,"long":498,"hashtags":499},"Pipeline Road in Coquitlam will be under construction until early 2028, a year later than planned, after Telus cables blocked Metro Vancouver's work for ten months.","Phase 1 of the 12-km Coquitlam Water Main project runs from Robson Drive to Guildford Way along Pipeline Road. Metro Vancouver announced the one-year delay on November 24. Mayor Craig Hodge asked for more signage to warn commuters at the November 23 council committee.",[113,500,501],"CoquitlamCouncil","MetroVancouver",{"sourceName":503},"Freshet News",true,"https:\u002F\u002Ffreshetnews.ca\u002Fcoquitlam-water-main-install-delayed-by-a-year",{"title":24,"description":25},"freshet-news:https:\u002F\u002Fwww.freshetnews.ca\u002F?p=17325",[509,511],{"label":510,"url":505},"Coquitlam water main install delayed by a year - Freshet News",{"label":512,"url":513},"Coquitlam water utility projects - Metro Vancouver","https:\u002F\u002Fmetrovancouver.org\u002Fservices\u002Fwater\u002Fcoquitlam-water-utility-projects","news\u002Fcoquitlam-water-main-pipeline-road-delay-november-2026","reported",[28,29,30,31],"coquitlam-water-main-pipeline-road-delay-november-2026\u002Ftransport","q98QnadsCi50SoGRVDwmWPgy6-UeTpGH85TVHHpYpZ8",[520],{"slug":468,"name":69,"office":233,"party":20,"portrait":521,"colour":530,"palette":20},{"src":522,"smallSrc":523,"width":524,"height":525,"alt":526,"credit":527,"sourceUrl":528,"position":529},"\u002Fimages\u002Fcandidates\u002Fcraig-hodge-640.webp","\u002Fimages\u002Fcandidates\u002Fcraig-hodge-320.webp",640,800,"Craig Hodge, from Elect Craig Hodge for Mayor of Coquitlam.","Elect Craig Hodge for Mayor of Coquitlam","https:\u002F\u002Fwww.craighodge.ca\u002Fachievements","50% 30%","blue",1795708006602]